ACCESS FLOOR AIR PLENUM SEALING DETAILS
UNDERFLOOR AIR SEALING LOCATIONS

Plan View Without Access Floor <autocad> <pdf>

BASE BUILDING CORE & SHELL SEALING DETAILS
A)

Perimeter Seam Along Slab & Exterior Wall 
<autocad>
<pdf>

B)

Enclosed Column Seam at Slab Line
<autocad> <pdf>

C)

Drywall Partition Condition 
<autocad> <pdf>
 

D)

Base of Stairs on Building Slab
<autocad>
<pdf>

E)

Top of Stair Interface with Concrete Deck
<autocad>
<pdf>

F)

Elevator Shaft Below Access Floor Line 
<autocad>
<pdf>

G)

Expansion Joint in Concrete Deck
<autocad> <pdf>

HVAC SYSTEM SEALING DETAILS
H)

Opening in Slab for Vertical Ducts
<autocad> <pdf>

I)

Opening in Plenum Walls for Ducts
<autocad> <pdf>
 

PLUMBING SEALING DETAILS
J)

Pipe Penetration Through Concrete Deck
<autocad> <pdf>
 

K)

Pipe Penetration Through Plenum Walls 
<autocad>
<pdf>
 

ELECTRICAL SYSTEM SEALING DETAILS
L)

Conduit Through Plenum Walls
<autocad>
<pdf>

M)

Open Ends of Conduit in the Plenum Space 
<autocad>
<pdf>

VOICE/DATA SYSTEM SEALING DETAILS
N)

Cable Penetrations Through Plenum Wall with Cable Sleeve
<autocad>
<pdf>


ACCESS FLOOR AIR SEALING LOCATIONS

Plan View With Access Floor <pdf>

ACCESS FLOOR SEALING DETAILS

1.

Plenum Dividers
<autocad>
<pdf>

2.

Air Highways
<autocad>
<pdf>

3.

Penetration Through Plenum Dividers
<autocad>
<pdf>

4.

Perimeter Seal Without Wall Base
<autocad>
<pdf>

5.

Perimeter Seal With Wall Base
<autocad>
<pdf>

6.

Perimeter Seal at Non-Smooth Walls & Columns
<autocad>
<pdf>

7.

Perimeter Seal at Smooth Walls & Columns
<autocad>
<pdf>

8.

Access Floor Seal at Fascia/Exposed Edge
<autocad>
<pdf>

9.

Perimeter Seal at Top of Stair Landing
<autocad>
<pdf>

10.

Perimeter Seal at Base of Stair Landing
<autocad>
<pdf>

11
Penetration in Wall through Access Floor
<autocad>
<pdf>
12.

Perimeter Seal at Fire Barrier Below Door Threshold
<autocad>
<pdf>

13.

Perimeter Seal At Curb Where Floor Covering Is Continuous 
<autocad>
<pdf>  

14.

Perimeter Seal At Curb Where Floor Covering Is Not Continuous
<autocad>
<pdf>

15.

Cable Cutouts & Grommets  
<autocad> <pdf>

16.

Power, Voice/Data Distribution Boxes In Access Floor Panels
<autocad>
<pdf>

17.

Pipe Penetration Through Access Floor
<autocad>
<pdf>

  PLENUM DIVIDER & AIR HIGHWAY
 

Plenum Divider - Straight Section 
<autocad>
<pdf>  

 

Plenum Divider - Perpendicular Sections 
<autocad>
<pdf> 

 

Plenum Divider - Corner with Miter Joint 
<autocad>
<pdf>

 

Plenum Divider - Corner with Butt Joint
<autocad>
<pdf> 

 

Plenum Divider with Conduit Bridge 
<autocad>
<pdf> 

 

Plenum Dividers for Air Highways 
<autocad> <pdf>              

  FIELD INSTALLED, OFF-MODULE FINISHES
 

Floor Coverings for Wet Areas 
<autoCad> <pdf>

 

Specialty Floor Finish Field Application 
<autoCad>
<pdf>

  STANDARD ACCESS FLOOR CONSTRUCTION DETAILS
 

Fascia Construction Detail 
<autocad>
<pdf>

 

Fire Barrier through Access Floor 
<autocad>
<pdf>

 

Pedestal Conditions - PosiLock Access Floor System 
<autocad>
<pdf>

 

Pedestal at Concrete Curb - Low FFH PosiLock A/F System 
<autocad> <pdf>

 

Pedestal at Wall - Low FFH PosiLock A/F System 
<autocad> <pdf>

 

Pedestal at Fascia - Low FFH PosiLock A/F System 
<autocad>
<pdf>

 

Pedestal Conditions - Stringer Access Floor System
<autocad>
<pdf>

 

Specialty Floor Finish Field Application
<autocad>
<pdf>

 

Ramp Assembly for Access Floor 
<autocad>
<pdf>

 

Ramp Assembly for Low Height Access Floor 
<autocad> <pdf>

 

Ramp Shoes
<autocad> <pdf>

 

Step Assembly - PosiLock System
<autocad>
<pdf>

 

Step Assembly - Stringer System
<autocad>
<pdf>

 

Transition to Elevator 
<autocad>
<pdf>

 

Transition between A/F Levels - Option 1 
<autocad>
<pdf>

 

Transition between A/F Levels - Option 2 
<autocad>
<pdf>

 

Transition from PosiLock to Stringer System 
<autocad>
<pdf>

  MOUNTING EQUIPMENT & STRUCTURES
 

Equipment Mounted to PosiLock A/F System 
<autocad>
<pdf>

 

Equipment Mounted to Stringer A/F System
<autocad> <pdf>

 

Equipment Anchored to Building Floor
<autocad> <pdf>

 

Glass Door Mounting
<autocad>
<pdf>

 

Guardrail/Handrail Mounting
<autocad>
<pdf>

 

Partition Mounted to PosiLock A/F System
<autocad>
<pdf>

 

Partition Mounted to Stringer A/F System
<autocad>
<pdf>

  SPECIAL CONDITIONS
  Bridge Method: Bridging Duct (pedestals through channel)
<autocad> <pdf>
 

Fin Tube Perimeter Heating 
<autocad> <pdf>

 

Supplemental A/F Support for Heavy Equipment
<autocad>
<pdf>

 

Bridging Method: Bridge over Obstruction - Option 1
<autocad>
<pdf>

 

Bridge Method: Bridge over Obstruction - Option 2
<autocad>
<pdf>

 

Bridging Method: Bridge over Trench
<autocad>
<pdf>

 

Expansion Joint in PosiLock A/F System
<autocad> <pdf>

 

Expansion Joint in Stringer A/F System - Option 1
<autocad> <pdf>

 

Expansion Joint in Stringer A/F System - Option 2
<autocad>
<pdf>

 

Floor Drain in Access Floor
<autocad> <pdf>

 

Pedestal with Anchor Bolts
<autocad>
<pdf>

 

Pedestal Head Types-Plycarbonate/Plexiglass Panels Posilock Systems
<autocad>
<pdf>

 

Perimeter Air Grille Support
<autocad>
<pdf>

  MISCELLANEOUS
 

Floor Finish Transitions
<autocad>
<pdf>

 

Grounded Access Floor
<autocad>
<pdf>

 

Security Barrier below A/F
<autocad>
<pdf>